SCDF Fire Safety Applications (BP / FP / MV)
We provide professional assistance for Singapore Civil Defence Force (SCDF) Fire Safety Applications, including Building Plan (BP) submission, Fire Safety Plan (FP) approval, and Minor Works (MV) applications. Our services ensure full compliance with SCDF fire safety regulations, helping clients achieve smooth approval processes for new developments, renovations, and fire safety system modifications.
why choose us
What Is SCDF Fire Safety Approval?
• The Singapore Civil Defence Force (SCDF)requires businesses
to obtain fire safety approval before operating, ensuring that
premises comply with fire safety regulations and protect
occupants and property.
• Depending on the scope of renovation works, SCDF approval may
be required under BP (Building Plan), FP (Fire Safety Plan), or MV
(Minor Works).
Building Plan (BP)
A Building Plan (BP) submission is required for major renovation works or structural alterations to a premise. This includes changes that may affect the building layout, fire safety design, or structural integrity, and must be reviewed and approved by the relevant authorities before construction works can commence.
why choose us
This includes:
- Construction or alteration of structural walls
- Changes to staircases, exit routes, or fire escapes
- Installation of fixed fire protection systems
- Significant building layout modifications
BP approval must be obtained before renovation works begin.
Fire Safety Plan (FP)
An FP submissionis required for minor renovations or internal layout changesthat
affect fire safety provisions but do not involve structural
works.
why choose us
Examples include:
- Internal layout reconfiguration
- Kitchen layout and equipment positioning
- Fire-rated walls, doors, and compartments
- Fire protection system layouts
FP approval is required prior to renovation works.
Minor Works (MV)
An MV submissionapplies to very small-scale worksthat have minimal
impact on fire safety and do not involve structural changes.
why choose us
Examples include:
- Installation or replacement of kitchen equipment
- Exhaust hood and ducting works
- Minor partition works
- Relocation of non-structural elements
MV submissions are typically simpler and faster but must still comply with SCDF fire safety requirements.
How ASSURE CONSULTING Supports Your SCDF Application
ASSURE CONSULTINGprovides end-to-end support for SCDF fire safety submissions.
why choose us
Our services include:
- Assessment of works to determine BP, FP, or MV requirement
- Coordination with Qualified Persons (QP) where applicable
- Preparation and submission of fire safety documents
- Liaison with SCDF and follow-ups
- Guidance on Fire Safety Certificate (FSC) issuance
We help ensure compliance, avoid delays, and keep your project on track.
